Cost estimate for the new Library war received from EDIS and the Library begins the value engineering phase to reduce the cost.

2/10  Followup annual appeal mailing to over 13,000 residents

2/14  Cost estimate for the new Library was received from EDIS and the Library begins the value engineering phase to reduce the cost.

2/18  The 2017 Annual report is delivered by the printer and copies are sent to large donors and it is posted on the website.  

2/22  Interviewed Capital Campaign consultants 

2/26  Interviewed Capital Campaign consultants 

02/28/2018 01:00:00 pm

Board + Building
Monthly updates about managing our library and preparing to build a new library center