Progress update from Fairmont Ventures on the feasibility study which is due to conclude round the end of August

7/7 -  Conference call with Fairmount ventures to review progress of feasibility study and refine the list of contacts.


7/17 -  Met with the Kennett Square Historical Architectural Board to request their approval of a demolition permit for the 120 S. Willow Street building.  The building will be demolished when construction of the new Library begins after the funds have been raised.  The new library building will extend onto the 120 S. Willow Street property. The demolition was approved.

7/19 -  Conference call with EDIS to discuss ways to reduce the cost of the new Library.

7/27 -  Meeting with Dennis Melton, local architect, to discuss ways to reduce the cost of the new library building.

7/30 -  Progress update from Fairmont Ventures on the feasibility study which is due to conclude round the end of August.